Tanks equipment
General information
Basic equipment is as following:
- W1 - bottom mainhole,
- W2 - upper mainhole,
- P1 - pipe liquid gauge,
- P2 - hydrostatic level measurement,
- O1 - vent with a net,
- C1 - CIP system,
- K1 - release / power connector,
- K2 - level sensor connector,
- K3 - temeperature sensor connector,
- K4 - aseptic samples dispenser tap,
- M1 - sideways mixer,
- M2 - up-right mixer.
The tanks design and make enable their washing using CIP system. The CIP system enables washing the components to be the tank equipment such as mixers, mainholes et cetera. Selected variants can be additionally sterilized with steam.